Power Station builds
Scarborough Power Project
– 1 nr MWM 2032 2.7MW output on Nat / Syn gas, build on site. For Edina
Cranfield University CHP
– 1 nr MWM 2020 v.16 1.5MW on Nat Gas + 5t/hr waste heat/fired steam boiler. For Edina
Thornton waste technology park
– 2nr MWM 2020V.16 1.5MW synthetic gas and 1nr Desulphurisation plant. (Global renewables) for Edina
Preston waste technology park
– 2nr MWM 2020V.16 1.5 MW synthetic gas and 1nr Desulphurisation plant. (Global renewables) for Edina
Chorley Hospital CHP
–1 nr MWM 2016 v.12 800kw output on Nat Gas. For Edina
Liverpool University CHP
– 2 nr MWM 2020 v.20 2MW output each on Nat Gas. Build on site project. For Edina
Belfast University CHP
– 1 nr MWM 2016 v.16 1.2MW & 1 nr 2016 v.12 800kw output on Nat Gas. One CHP built on site. For Edina
R&R Ice Cream
– 2 nr MWM 2020 v.20 2MW each on Nat Gas with 2 nr waste heat boilers. For Edina
Myatt’s Fields CHP
– 1 nr MWM 2016 v.12 800kw output on Nat Gas (EON Project) for Edina
Colindale CHP
– 1 nr MWM 2016 v.12 800kw output on Nat Gas (EON Project) for Edina
Royal Marsden Hospital CHP
– 1 nr MWM 2020 v.20 2MW output. For Edina
Citigen CHP
– 2 nr MWM 2032 2.7MW output on Nat gas, build on site. (EON Project) for Edina
Cynon, power Ltd Aberdare CHP
– 8 nr MWM 2020 V.16 1.5MW on natural gas. (Welsh Power Project) For Edina
Selby Power ltd
– 8nr MTU 16v4000 2mw on natural gas (Welsh Power project) for Ener-g